Posts by Peter Mason

Replacing the old flag pole

At last, the club has sorted out what to do about replacing the 80 year old flagpole which had become dangerously rotten in places. The new pole will be a close replica of the old one and will be made from Douglas Fir by shipwrights and riggers from the Cutty Sark. It is being fabricated now and should be installed at the end of January. The photo shows Ian Bell (ex Cutty Sark) safely lowering the old pole for it to be used as a pattern for the new one. The plan is to have this raising-and-lowering system to hand
Read More

Team 11 dinner at Tamesis

Forty people, including eight Tamesis members, attended the Team 11 dinner on Saturday 2 August. It was a lovely summer evening and the food was what Team 11 do best, seemingly casual and informal but really very complex and needing real skill to produce.
Read More